A Scalable Easee EV Charging System for BPC

A Scalable Easee EV Charging System for BPC

As specialists in UPS's and related power protection products, BPC are no strangers to the provision or reliable power. When selecting an EV charging system for their UK premises, they chose iDACS to carry out the specification and installation.

BPC were looking to install EV chargers at their facility in Romsey, Hampshire. They also wanted to make the most of GOVT grants, which would reduce the coat if the project.

After discussions with our EV team, they decided to install three active Easee EV charges, under the Workplace Charging Scheme grant, and two Easee Ready pre-configured backplates) which allowed them to benefit from the additional EV charging Infrastructure grant.

The combination of these grants covered more than half of the overall cost.

The configuration chosen will allow BPC to add two more active chargers to the system, when required, simply by clipping active ‘robots’ into the pre-installed Easee Ready bases. Giving them a total of 5 active charging points when more capacity is required for fleet and staff EVs.

iDACS will return to site, to help with charger commissioning and further grant applications, when BPC are ready to add the extra chargers.

To find out more, or to arrange your own free site survey, please get in touch, or book a call with our EV team.

Get in touch to find out how we can help with your next project

Whether you have a technical question, would like a quote or to arrange a site survey, please contact our team.