Case Studies

iDACS reference projects for EV charging IT infrastructure and Datwyler cabling solutions in the UK and globally

SONY MUSIC

IT Infrastructure

iDACS supplied over 340km of bespoke white Datwyler cable and related components for the new SONY MUSIC ENTERPRISES Data Centre in Kings Cross. The project was installed by Datwyler certified installers, The Cabling Group, who iDACS worked with closely during every stage of the process.

Read more

RATHBONES

IT Infrastructure

This forward-thinking company specified a Datwyler structured cabling solution for its office in London, as it offered high performance for long-term network support. As the exclusive UK source of Datwyler cabling products, iDACS worked closely with The Cabling Group, who delivered the installation, to ensure a smooth project roll-out.

Read more

SHELL

IT Infrastructure

The company's own plans for the future are being realised with the redevelopment of the Shell site on London's South Bank. Incorporating the existing 27-floor Shell Centre Tower plus new buildings; the project includes 245,000 sq ft of new office space and trading floors for Shell. The office expansion will allow all 4000 of Shell's London-based staff to be located on one site for the first time.

Read more

Allianz Arena Relies on IT Infrastructure

IT Infrastructure

When the soccer world championships ‘kicked off’ on June 9, 2006 in the Allianz Arena, Munich, cables and components from Datwyler played a major part. High-performance products from Datwyler provide a substantial part of the Allianz Arena’s passive network cabling infrastructure.

Read more

Hyperion

IT Infrastructure

When specifying the network infrastructure for its new offices in Creechurch Place, London, Hyperion decided on a high performance cabling solution from Datwyler. Cordless Consultants worked with ExcelRedstone, (Datwyler certified Installers) and iDaC Solutions (the exclusive source of Datwyler products in the UK&I), to deliver the project.

Read more

Cancer Research UK

IT Infrastructure

To accommodate it's London-based staff, CR UK moved it's HQ to new premises within the International Quarter in Stratford. The state-of-the-art building offers a better working environment for employees and access to leisure and retail facilities nearby. Over 315km of Datwyler Cat6A cable was specified, and installed over 3 floors of their building.

Read more

Get in touch to find out how we can help with your next project

Whether you have a technical question, would like a quote or to arrange a site survey, please contact our team.