IDAC Solutions
IDAC Solutions

Datwyler cabling solutions have been specified in some of the World’s most impressive buildings and by many global corporations. Our case studies show that our clients recognize the commercial benefits of using our high quality, reliable cabling systems; to support their business goals, improve efficiency and increase productivity. For the full range of Datwyler Case Studies please click here

Rathbones (London) office

New Offices for Rathbones

Rathbones are one of the UK’s leading providers of investment management services for individuals, charities and professional advisers. Their goal is to help clients to ‘look forward with confidence’. This forward thinking company recently specified a Datwyler structured cabling solution for its new office in London, as it offered high performance for long-term network support.

Read more
Cat 6a Datwyler cable Towergate Case Study

Towergate Insure Their Network Investment

Towergate specialise in property, liability, motor, professional indemnity and jeweller’s block insurances; with a focus on ‘managing your risk and reputation’ as part of their company ethos. In the same vein, iDaC Solutions supplies high performance structured cabling solutions that ensure effective network operation and minimise the risk of downtime.

Read more
Data Cable Audi Q5 Case Study

Cat 7 Data Cable for Audi Q5 Manufacturing Plant

For their ultra-modern plant in San Jose Chiapa, Mexico, Audi AG opted for a future-proof, high-performance cabling solution from Datwyler. More than 600 kilometres of “CU 7120 4P” data cable and more than 17,000 RJ45 Cat 6A outlets were delivered for this project.

Read more
iDaC Solutions Case Study UBM Blackfriars

Prestigious Headquarters for Communications Experts

UBM is a market leading and multi award winning media business – helping clients to make connections (through events), communicate their business proposition (through a range of print and digital marketing materials) and do business effectively (using interactive communications tools).

Read more
iDaC Solutions Case Study Rathbones London

Essential in providing operational efficiency

Rathbones installed a Datwyler communications network in its new London premises. The project involved the installation and commissioning of more than 1000 Category 6 cabinet links and 2000 RJ45 telecommunication outlets. The fibre backbone links include OM3 Multimode and OS2 Single-mode cable, LCD panels and other FO components.

Read more
iDaC Solutions Case Study Schroders building

Schroders Invests in Datwyler to Ensure Guaranteed Future Connection

Schroders decided to utilise a full Datwyler communications network in the refurbishment of its Central London location near St. Pauls Cathedral. This included 5000 Cat 6 cabinet links and 2500 communication outlets, coupled with 1000 FO connections across OM3 Multimode for CER to CER and OS2 Singlemode in the backbone all utilising LC connectivity.

Read more
iDaC Solutions Case Sudy Rolls-Royce cabling infrastructure

Leading European car manufacturer Installs 800 MHz cabling infrastructure

A high performance Datwyler cabling system has been installed at the all new manufacturing plant and head office of Rolls-Royce Motor Cars Limited at Goodwood, West Sussex, using Cat.7 cable and Cat.6 shielded connecting hardware. The new infrastructure with 800 MHz of bandwidth guarantees the best performance to support the various manufacturing, voice, data and communications applications.

Read more
iDaC Solutions Case Study Hampshire County Council

Council opts for speed with pre-termination

To be able to use the Dorset County Council data centre as its Disaster Recovery location, Hampshire County Council needed to locate hardware and services in Dorchester. Datwyler was selected to supply its pre-terminated bespoke ‘Trunk’ cabling system which enables very short data centre installation times on site.

Read more
Datwyler Case Study Dubai Sky Tower

A Fibre Optic Network for Al Reem Island

Datwyler commissioned by Etisalat to develop the access network on Al Reem Island off the coast of Abu Dhabi. The project involved installing a PoP in the Sky Tower, the installation of fibre optic networks in several highrise blocks and connections between the PoP and the individual buildings.

Read more
Fire performance cable Datwyler Case Study O2 Berlin

Safety Cabling for O2 World in Berlin

In September 2008 one of the most modern multi-purpose arenas in Europe opened – O2 World in Berlin. In the event arena, the safety systems are powered using certified safety cables and components from Datwyler.

Read more
allianz stadium datwyler case study

Soccer Championship Security: Munich Allianz Arena relies on Datwyler Cabling Systems

When the soccer world championships ‘kicked off’ on June 9, 2006 in the Allianz Arena, Munich, cables and components from Datwyler played a major part.

Read more
Datwyler Case Study data and fire safety

Data Cables and Safety Cables in the German School in Madrid

Datwyler supplied not only the cables and components for the German School’s communications network but also the safety cabling in the new building. The reason is that both system solutions met the highest quality standards.

Read more
LBB Landesbank Berlin, London facade

New network for LBB Landesbank Berlin in London

With the partner companies 2BM, G4 and Datwyler the London Branch of LBB Landesbank Berlin decided for a high-quality communications cabling and comprehensive data centre solution.

Read more
iDaC Solutions Case Study Westpac London

Westpac Bank counts on Datwyler

Excel I.T. installed a reliable, flexible and robust network cabling solution by Datwyler at the Australian Bank´s new London headquarters.

Read more
Lift Cable Datwyler world trade centre case study

Lift cables for the new World Trade Center

Datwyler is commissioned to supply lift cables for the new World Trade Centre, including the Freedom Tower, in New York.

Read more
Building Distribution cables Datwyler case study Sofitel Heathrow

Hotel Sofitel London Heathrow chooses cabling solution from Datwyler

The recently opened 5-star hotel Sofitel London Heathrow, adjoining the airport's new Terminal 5, exceeds all expectations – and the owner equally expected suppliers to do the same. A cabling system from Datwyler was selected for the building automation system. With this cabling solution the installation was finished in record time.

Read more
Multimedia cabling for University Datwyler Case Study

Multimedia network for new University building in Basel

The new campus of the renowned Academy of Art and Design at the University of Applied Sciences Northwestern Switzerland (FHNW) is currently being constructed on the Dreispitz site in Basel. Datwyler is supplying the universal communications cabling system for the new campus tower block.

Read more
WLAN Projects in Austrian Schools Building

WLAN Projects in Austrian Schools

Datwyler’s WLAN products are in great demand, particularly from educational establishments, trade fair and conference organisers, hospitals, and in the office environment. In Austria some of the most important customers are schools.

Read more
Siloam Hospitals Group Building

New Communications Network For Siloam Hospitals Group

The leading Indonesian health service provider demands high standards of quality and sustainability in its work. These aspects were precisely what convinced it to opt for a Datwyler system solution when installing new cabling in SHG hospitals.

Read more
FHS University Centre Class FA Cabling System Building

Sound Basis For A Long Life Cycle: FHS University Centre Class FA Cabling System From Datwyler

In July 2013 FHS St. Gallen opened its new University Centre by the main station. The new building was equipped with cutting edge technology, including a high-performance Class FA communications network from Datwyler.

Read more
Datwyler Data Centre Solution For New Swisscom Data Centre building

“Datwyler Data Centre Solution” for new Swisscom Data Centre

Swisscom operates one of Europe’s most modern and efficient data centres in the Bern-Wankdorf Business Park. The “Datwyler Data Centre Solution” was selected for the high speed fibre optic links.

Read more
Preassembled Solution For Huawei Data Centre

Preassembled Solution For Huawei Data Centre

Huawei trusts in Datwyler cabling systems for its new manufacturing base in Huangzhou. Using preassembled products meant that installation was simple, neat and, above all, fast.

Read more
Stuttgart’s new City Library building

Modern, efficient and safe: The “lifeblood” of Stuttgart’s new City Library

Since October 2011 the City of Stuttgart has a new, ultra-modern city library. Generating some of the “lifeblood” of this architecturally striking building are its powerful communications cabling and a reliable fire safety cable system, both of which owe their origins to Datwyler.

Read more
Hitachi Medical Systems Europe Standardised IT Network building

Standardised IT Network for Hitachi Medical Systems Europe

HMSE has installed a high-quality cabling solution from Datwyler on all its sites. Following completion of the installation in France, for which Datwyler acted as project manager, the company now has a standardised, high-performance communications network which allows the central monitoring, maintenance and control of IT.

Read more
Rhineland Regional Association building

Datwyler to wire up new data centre for the Rhineland Regional Association

With a view to streamlining its operations, LVR-InfoKom, the system house for the Rhineland Regional Association LVR, has expanded its principal data centre in Cologne and relocated it to a new building. The contract for the re-wiring was awarded to Datwyler who offered an economical overall solution, rapid completion and software-supported planning and documentation.

Read more
Cat7 Cable Datwyler BMW Case Study

BMW dealer North Oxford Garage installs Class E network from Datwyler

North Oxford Garage, one of the biggest BMW dealerships in England, has opted for cabling solutions from Datwyler when building new commercial premises and workshop facilities. For EMV sensitive areas, especially in workshops, a shielded solution (STP) was employed.

Read more